Homeowner Guide · Carpentry

What Goes Into the Price of Skirting and Architrave

A practical guide to the work, materials and hidden costs behind this job.

Skirting and architrave replacement is one of those jobs that transforms a room — and one where the quote often looks high "for some bits of wood". The wood is the cheap part. The job is in everything around it: the removal, the wall repairs, and the cutting that makes new boards look like they were always there. This guide explains where the money actually goes.


What the job actually involves

Fitting the new boards is the quick part. Getting the old ones off, putting the wall back together and cutting joints that stay tight is where the time goes.

01

Removing the old boards

Old boards are often glued, screwed and painted into the wall, and in period homes the plaster can come away with them.

02

Repairing the wall

Where the plaster does come away — and it usually does somewhere — the wall is made good first.

03

Cutting the new boards

External mitres, internal scribed joints, and the joints along long walls.

04

Fixing to the wall

Masonry, dot-and-dab plasterboard or stud — whatever the wall turns out to be, each needs a different approach.

05

Filling and caulking

Filling, caulking the top edge and sanding, ready for paint.

06

Architrave

Mitres around every door, on show at eye level, with no tolerance for gaps.

07

Painting

If it is in scope: priming, caulking and two topcoats — a decorator's job in its own right.


What goes into the price

The timber is a modest share of this job. Most of the price is careful labour and the unglamorous costs that come with it.

  • Materials — MDF, softwood or hardwood — and profile complexity and board height all move the price. Tall, ornate period profiles can need specialist machining.
  • Labour — Dominated by the quality of the cutting and fitting. Rooms are never square, floors are never level and walls are never flat.
  • Removal and wall repair — The wildcard in the job: modern boards come off easily, older ones take plaster with them, and the repair time cannot be known up front.
  • Consumables — Adhesive, fixings, filler, caulk, blades and sandpaper. Caulk and filler consumption on this job is far higher than homeowners expect.
  • Waste disposal — Old painted timber cannot be casually dumped or burned. It goes for licensed disposal, and there is usually more of it than expected.
  • Logistics — Long lengths — four to five metre boards — need the right vehicle and careful handling, plus daily travel and merchant trips.
  • Decoration — If painting is included, add primer, caulk, paint and a day or more of decorating time. Priming, caulking and two topcoats is a decorator's job in its own right, not something tacked onto the end of a carpenter's afternoon.

Why quotes vary

Two quotes for the same run of boards can differ honestly. These are the key variables to compare, line by line.

Cost driver Why it matters
What is being removed Modern MDF pops off; 1930s boards fight back.
Wall condition behind What the plaster is like once the old boards are off, and how much repair it needs.
Profile and material MDF, softwood or hardwood, and how ornate the profile is.
Painting Included in the price, primed only, or left entirely to you?
Room complexity Bay windows, alcoves and stairs multiply the number of cuts.
Flooring sequence Fitting above existing carpet, to bare floor or around new flooring are different jobs.

Scribed joints note: Internal corners should be scribed rather than mitred. Scribed joints stay tight as the timber moves; mitred ones open up. It is the mark of a proper job.


Questions worth asking

A clear quote makes its important assumptions visible. Use these questions before you appoint a trade.

  1. Does the price include removing the old boards and repairing the wall behind?

  2. What material and profile is quoted, and can I see a sample first?

  3. Are the internal corners going to be scribed, or simply mitred?

  4. Is painting included in the price — primed only, or fully finished?

  5. Should this happen before or after my new flooring goes down?


About "getting a better deal"

The timber is a modest share of this job; most of the price is careful labour and the unglamorous costs around it — disposal, consumables, travel. Knock the price down and the carpenter's day rate absorbs it, or the prep and the finishing quietly shrink: fewer coats, mitred shortcuts, plaster repairs left to you. None of that is visible on the day the boards go on. It shows up later, at the internal corners that have opened and along the top edge that was never properly caulked.

Better ways to bring the budget down

  • Change the inputs rather than the rate: a simpler profile costs less to buy and less to cut.
  • Choose MDF instead of hardwood where the boards will be painted anyway.
  • Take on the painting yourself, and have the carpenter leave the boards ready for primer.
  • Keep the board height and profile modest, so no specialist machining is needed.
  • Clarify the sequence with any new flooring before either job is booked.

Change the inputs, not the rate — same craftsmanship, honest price.


Ready to renew skirting and architrave?

Enter your postcode and we'll search trusted local carpenters near you.

Please enter a valid UK postcode.

You'll be taken to the TAPE platform to compare quotes from verified local tradespeople — free to use, no obligation.

Want to keep this guide handy?