Homeowner Guide · Electrical

What Goes Into the Price of a Consumer Unit Upgrade

A practical guide to the work, materials and hidden costs behind this job.

Replacing a consumer unit is a half-day to full-day job that homeowners often expect to be priced like an hour's work — "it's just swapping a box, isn't it?" It isn't, and much of what you are paying for is the testing that happens either side of the new board going on. This guide explains where the money actually goes.


What the job actually involves

Swapping the box is the quick part. A responsible electrician works through seven stages, and the longest of them is testing the installation that is already there.

01

Inspection and testing

An old installation is never connected to a new consumer unit blind. Every circuit is inspected and tested first.

02

Isolating the supply

Sometimes coordinated with the network operator, if the main fuse needs pulling.

03

Circuit by circuit

Every circuit disconnected, labelled and then reconnected to the new board.

04

Modern protection

RCDs or RCBOs fitted, plus surge protection where the current Wiring Regulations call for it.

05

Bonding checks

Gas and water bonding often needs upgrading at the same time — a legal requirement before sign-off.

06

Faults found and fixed

A new board exposes faults an old fuse board tolerated silently. Those must be found and fixed, not hidden.

07

Testing and certification

Full testing of every circuit, the certificate, and notification to Building Control.


What goes into the price

This is notifiable work under Part P in England and Wales, and the half of the job you cannot see — the testing and the paperwork — is the half that makes it safe.

  • The board and devices — An RCBO board — one protective device per circuit, so one fault does not black out half the house — costs more in materials than a basic twin-RCD board, and most electricians now recommend it.
  • Labour — Typically most of a day, and the electrician is committed to your job: the power is off, so they cannot leave part-way through.
  • Testing time — Often half the job. It is invisible to you, but it is the part that makes the installation safe and certifiable.
  • Remedial work — Faults discovered during testing — and in older properties there usually are some — take parts and time. Good quotes explain how these are handled and priced.
  • Consumables — Tails, glands, labels, bonding cable and clamps, all of which have to be right before the board can be signed off.
  • Logistics and disposal — Travel to and from the job, and the old board and its packaging taken away afterwards for proper disposal.
  • Compliance — Scheme registration with NICEIC, NAPIT or similar, insurance, calibrated test instruments recalibrated every year, and Building Control notification. This is notifiable work under Part P in England and Wales, and the Electrical Installation Certificate is part of the product.

Why quotes vary

A suspiciously cheap quote may simply exclude the testing, or assume no faults will be found. These are the drivers to compare.

Cost driver Why it matters
Board specification An RCBO board against a basic twin-RCD board.
Surge protection Included in the price, or left out and offered later as an extra.
Age of the installation A well-maintained 1990s house tests quickly; a 1960s house with DIY additions does not.
Bonding upgrades Gas and water bonding upgrades included in the quote, or priced separately.
How remedials are handled Faults found during testing: allowed for in the quote, or charged as they come.
Testing included A suspiciously cheap quote may simply exclude the testing altogether.
Fault assumptions Some quotes quietly assume that no faults will be found at all.

Bonding note: Gas and water bonding often needs upgrading at the same time. It is a legal requirement before the new consumer unit can be signed off.


Questions worth asking

A clear quote makes its important assumptions visible. Use these questions before you appoint a trade.

  1. Are you registered with a competent person scheme, and will Building Control be told?

  2. Is the quote for an RCBO board, and is surge protection included in the price?

  3. Is circuit testing included in the price, and what happens if you find faults?

  4. Are gas and water bonding checks and upgrades included in the quote?

  5. Will I receive an Electrical Installation Certificate at the end?


About "getting a better deal"

The board, the devices and the certification costs are fixed. The testing takes the time it takes — and that is the safety-critical part of the job. A cheaper price means either the electrician earns less for a day of skilled work, or corners get cut on precisely the part of the job you cannot see and cannot check. With electricity, the cheap job and the dangerous job can look identical on the day the van drives away. Judge this one on registration, thoroughness and paperwork, rather than on price.

Better ways to bring the budget down

  • Ask what the quote assumes about faults, so you are comparing like with like.
  • Compare an RCBO board against a twin-RCD board knowingly, not on the number alone.
  • Have any bonding upgrades quoted up front, so they do not surprise you mid-job.
  • Ask for testing and remedials to be shown separately, so you see what you are buying.
  • Judge quotes on registration, thoroughness and paperwork, not on price.

With electricity, the cheap job and the dangerous job can look identical.


Ready to upgrade your fuse board?

Enter your postcode and we'll search trusted local electricians near you.

Please enter a valid UK postcode.

You'll be taken to the TAPE platform to compare quotes from verified local tradespeople — free to use, no obligation.

Want to keep this guide handy?